Confronto specifiche tecniche

Germany BAFA EEW Incentives Module 4

State Incentives and Energy Efficiency 2026

In brief:The purchase of this product is eligible for subsidies in Germany (up to 55% as a non-repayable grant via BAFA EEW Module 4) if included in an energy efficiency project with data interconnection to the company network.

This product is classified as advanced technological capital goods that can benefit from a non-repayable grant of up to 40% (increased up to 55% for SMEs) of eligible acquisition costs, in accordance with the rules of the federal EEW Module 4 program managed by BAFA. For companies in the manufacturing sector, this mechanism translates into a net economic saving and a direct injection of liquidity into their bank account, proportional to the tons of CO₂ saved thanks to the investment.

Energy Efficiency Requirement (EEW Module 4 Program): The new 2026 scheme requires that the overall investment generates a certified and quantifiable reduction in energy consumption and CO₂ emissions compared to the situation prior to the purchase of the goods.

The four mandatory conditions to access the economic benefit are:

  • Modernization or new plant: The component cannot be purchased as a simple spare part to replace a faulty old inverter. It must be integrated into a technological modernization project for an existing line or the creation of a new production facility aimed at resource savings.
  • Interconnection to the factory network: The inverter must not operate in isolation. Connection to the company's information system, PLC, or management software via the integrated communication port is mandatory to allow bidirectional data exchange for real-time monitoring of energy consumption.
  • Mandatory prior application: Access to the subsidy requires submitting a prior electronic application to the competent authorities. Approval of the application and reservation of funds must strictly take place before signing the purchase order or supply contract.
  • Classification as capital goods: The purchase must be recorded in the company's accounting as an investment in depreciable assets (fixed assets) and cannot be included under ordinary maintenance or operating expenses.

Frequently Asked Questions for e-commerce purchases:

Is there a minimum spending amount? No, the subsidy is applicable even to a project involving a single inverter, provided the overall intervention meets the minimum CO₂ reduction threshold stipulated by the guidelines for Module 4.
Are installed accessories eligible? Yes, components necessary for the inverter's operation, such as programming keypads, network cards, filters, or braking resistors, qualify for the non-repayable grant provided they are included on the same purchase invoice as the main product and included in the approved energy project.

Legal disclaimer

This text is for informational and promotional purposes only, based on interpretations of tax legislation and incentive programs currently in force in Germany for industrial energy efficiency. The seller provides only the ordered hardware components and accessories and does not offer fiscal, engineering, or tax advisory services.

The actual eligibility of the goods for German state subsidies, the calculation of actual economic savings or CO₂ reduction, compliance with technical interconnection requirements, and the outcome of the prior application procedures remain the sole and exclusive responsibility of the buyer and the professionals appointed by them on German territory. The seller disclaims any legal and financial liability in the event of failure to obtain, revocation of, or penalties related to contributions and bonuses derived from the purchase of the products.